Jobs > Job Details

Mechanical Symphony

3D Designer
Budget $1,083.33
Open job

DELIVERABLES:

  1. OPERATIONAL & FUNCTIONAL WORKING MECHANICAL ORCHESTRA.

Including:

  1. DESIGN - specifications of components
  2. MANUFACTURE - of components
  3. ASSEMBLY - of components
  4. DISSASSEMBLY - of components
  5. COMPONENTS MANUAL – List of all components, movements and connections and functions, their description and figures (illustrations) , with detailed and illustrated instructions for their construction
  6. ASSEMBLY MANUAL – Description and user friendly illustrated process of the assembly and disassembly of all the components. With detailed and illustrated instructions .
  7. OPERATIONAL MANUAL – DESCRIBING SWITCHES, COMBINATIONS and FUNCTIONS With detailed and illustrated instructions for their construction and operation.
  8. MUSICIANS and CONDUCTOR to be independent and plug and play components, enabling their easy assembly and disassembly onto the main platform. with detail instructions for their construction and assembly.
  9. PACKAGING and SHIPPING – of components

REQUIREMENTS:
• Mechanical Metal figurines on a Metal Base.
An orchestra of 8 musicians and a Conductor, on a metal platform with an under base ( See figures below).
ILLUSTRATION:

The MECHANICAL FIGURINES movement are mechanical : linkages or rods in the body connected to a set of cams, and wheels concealed in the platforms base.
A common electric source motor sourcing power from a wall outlet will drive all the mechanical movement.
All parts to be made of METAL.
The MECHANICAL FIGURINES:
Each Mechanical figurine‘s Form, Size and Movement are defined below .
Each MECHANICAL FIGURINE will be attachable and detachable from a metal base on the surface of the metal platform.
The metal platform will encase an under base.

THE UNDER BASE
This under base is to contain the operational functionalities, controls and mechanisms, and power source, feeding the figurine metal bases on the surface of the metal platform.
• CONTROL UNIT:
Built into the base with a slide or lift cover on the platform allowing access to the control unit.
Accessed from the top of the base.
ILLUSTRATION:

The control Unit Contains:
• Play / Pause Buttons (which signals the motors to start), (And soon as the play button is hit the orchestra is set in motion and music played from USB stick continuously until power off).
• Volume Button
• Speed Control Button (Movement of figurines)
• USB slot for USB stick ( with music files) ( Depth of Control Unit to fit USB stick plugged in with cover of control unit closed)

SPEAKERS
Built into Base. With grills on the base on the top .
Small grills, clear crisp sound Play-back

ILLUSTRATION:

FAN:
Silent Fan, to keep cool and blow dust out of base.
MOTOR:
Built into base.
Power from wall outlet. plug slot unit built into the back of the base . Universal plug slot unit.

POWER:
230V/50 Hz

STAGES for Sign off

• STAGE 1: COMPLETE DESIGN

  1. Make the CAD model.

  2. Apply all the mechanism that we want. (PLATFORM, PLATFORM COMPONENTS , FIGURINES, BASE, BASE COMPONENTS, [this will be the complete designing]
    Mile Stone 1: Approve Design and Layout
    STAGE 2: Sourcing parts, Making customized parts and Assembly.

  3. Sourcing the parts, and making customized parts
    .
    Milestone 2: Approve MECHANICAL FIGURINES AND THEIR MOVEMENT, PLATFORM, UNDERBASE
    STAGE 3: Assembly, customizing parts , and full functionality of finished product

  4. ASSEMBLY and Customizing parts accordingly to enable required smooth functionality.

  5. The iterative process will continue until a reliable mechanism as achieved.

  6. The complete assembly is put together [ including the metal platform and the under base]. Reinspected to see if there are any things that are missed out/or can be improved. As per required specs.
    Milestone 3: Approved assembly and full functionality and operation of finished product
    STAGE 4: DISASSEMBLY, ASSEMBLE MANUAL, PACKAGING and Shipping OF ALL

  7. Disassembly is done… and an assembly manual is made… the parts are carefully packaged… and shipped
    Milestone 4: Receipt of goods and their assembly on site and full functionality / operation.

  8. Delivery and Successful assembly and operation, on site.

GENERAL: all the milestones and decision-making areas to be communicated through the platform supplemented by zoom where necessary for reality.
All necessary Functional changes shall be achieved before the project is finally shipped.

FIGURINNES & MOVEMENTS
Figurines are 3D
Die Cast Metal (COPPER) or hammered/twisted soft metal.
A clay figurine will have to be made… that will match what we want it to look like… the features such as the jackets and the pants and the instruments as well…
All standing figures to be 10 cm high
Body parts to be ratio accordingly as well as instruments.
Sitting figures drummer and pianist ratio accordingly.
Space between figurines to allow for freedom of movement plus 1 cm.

https://1drv.ms/b/s!AtAm14JJY_91jTFM5N7W2NzDZykG?e=QXiU5j

In what capacity are you hiring?
As an individual for a personal project

Where are you in the hiring process?
I’m likely to make a paid hire

Would you like to state a preference for hiring from underrepresented group(s)?
No preference

Where did you find Twine?
From a friend

Is this an independent one off job, or part of a larger project?
Single job with no follow up work

For what period of time will the freelancer be needed?
More than a week

What freelancer experience level is needed? (per hour)
Mid-level (Industry Average): $35-75

Posted 2 months ago
Private
based in Thalwil, Switzerland
Last online: a month ago


Any issues? Report a user here
  • Work has begun on this job

    ...but don't worry, your next job is waiting for you on the Jobs page