I’m a mining surveyor and mine geology technician with 11+ years of experience supporting open-pit mining operations. I handle mine surveying and geological support across tasks like setting out mining boundaries, conducting stockpile surveys, calculating coal and waste volumes, and keeping mine plans and survey information up to date. I’m also experienced with GNSS/GPS and Total Station operations, including RTK workflows, and I’ve worked with laser scanning using Mapttek I-Site technology. Alongside technical accuracy, I focus on safety, quality control, and effective documentation—whether mapping geological contacts, sampling rock/coal/soil, or preparing technical reports that support day-to-day mining decisions.…

Isac Chimica Mine Surveyor | Mine Geolog

I’m a mining surveyor and mine geology technician with 11+ years of experience supporting open-pit mining operations. I handle mine surveying and geological support across tasks like setting out mining boundaries, conducting stockpile surveys, calculating coal and waste volumes, and keeping mine plans and survey information up to date. I’m also experienced with GNSS/GPS and Total Station operations, including RTK workflows, and I’ve worked with laser scanning using Mapttek I-Site technology. Alongside technical accuracy, I focus on safety, quality control, and effective documentation—whether mapping geological contacts, sampling rock/coal/soil, or preparing technical reports that support day-to-day mining decisions.…

Available to hire

I’m a mining surveyor and mine geology technician with 11+ years of experience supporting open-pit mining operations. I handle mine surveying and geological support across tasks like setting out mining boundaries, conducting stockpile surveys, calculating coal and waste volumes, and keeping mine plans and survey information up to date.

I’m also experienced with GNSS/GPS and Total Station operations, including RTK workflows, and I’ve worked with laser scanning using Mapttek I-Site technology. Alongside technical accuracy, I focus on safety, quality control, and effective documentation—whether mapping geological contacts, sampling rock/coal/soil, or preparing technical reports that support day-to-day mining decisions.

See more

Experience Level

Expert
Intermediate
Intermediate
Intermediate
Intermediate
Intermediate
Intermediate
Beginner
Beginner

Language

Portuguese
Fluent
English
Advanced

Work Experience

Técnico de Geologia at Vulcan, Vale, Mota-Engil
January 1, 2022 - Present
Realizei mapeamento geológico e identificação de litologias; amostragem de rochas, carvão, solo e outros materiais. Fiz logging geológico (descrição de testemunhos/sondagens), apoio a programas de prospecção e pesquisa mineral, e delimitação de contatos minério/carvão e estéril. Marquei polígonos e frentes de lavra e áreas de exploração, recolhi, organizei e interpretei dados geológicos e elaborei relatórios e mapas geológicos. Atuei ainda na monitoração de riscos geológicos (falhas, diques e instabilidade de taludes), assegurando o cumprimento de normas de segurança, saúde e meio ambiente em atividades de campo. Operação com GPS/GNSS e instrumentos geotécnicos/geo-topográficos conforme o plano de trabalho.
Mine Geology Technician at Vulcan
January 1, 2022 - Present
Conducted geological mapping and identified lithologies in active mining areas. Performed sampling of rock, coal, soil, and other geological materials. Supported geological logging and drilling activities, delineated contacts between coal and waste material, and monitored coal quality and contamination control during mining operations. Marked mining polygons, mining fronts, and exploration areas in coordination with survey teams. Collected, organized, and interpreted geological data; prepared technical reports and geological maps; used GPS and geological/mining software to support field activities; monitored geological risks (faults, dykes, and slope instability); and ensured compliance with health, safety, and environmental requirements during fieldwork.
Técnico de Geologia (Geologia de Minas) at Vulcan (Vulcan International)
January 1, 2022 - Present
I coordinated geologic field activities and provided technical support for exploration and mine operations, including mapping, sampling, logging, separating ore from waste, geologic risk monitoring, and preparing technical reports and geologic maps. I ensured field compliance with corporate safety and environmental procedures, and used GPS/GNSS equipment and mine surveying software to support accurate execution.
Técnico de Geologia at Vulcan (Vale/Moatize e Vale/Mota-Engil)
January 1, 2022 - Present
Realizei mapeamento geológico e identificação de litologias, amostragem de rochas, carvão, solo e outros materiais, e suporte a programas de prospecção e pesquisa mineral. Atuei no controlo de qualidade do minério e prevenção de contaminação durante a lavra, marcação de polígonos e áreas de exploração com apoio topográfico, recolha/organização/interpretação de dados e elaboração de relatórios técnicos e mapas geológicos. Incluí ainda monitorização de riscos geológicos em campo (falhas, diques e instabilidade de taludes) e utilização de GPS/bússola geológica e softwares como Surpac e Maptek. Operação com GPS/GNSS (Topcon/Trimble/Leica/Maptek) e Estação Total (Leica/Topcon).
Topógrafo at Vale (Tete / Mota-Malugue)
April 1, 2016 - January 1, 2022
Como topógrafo em mina de carvão, realizei marcação de limites da lavra e marcação de furos para perfuração e desmonte. Levantei pilhas de estéril e carvão, calculei volumes de minério e estéril, e atualizei mapas da mina. Apoiei a equipe de geologia e o planejamento, controlando a marcação e a evolução das frentes de lavra e das rampas de acesso. Implantei marcos geodésicos e pontos de controle, executei medições para cálculo de volumes de corte e aterro, controle de taludes e rampas, e cálculo de volumes de carvão e estéril. Processsei dados topográficos em Surpac e elaborei memoriais descritivos e relatórios técnicos; delimitei polígonos da lavra e medi a cota da cava, além de controlar taludes e rampas.
Topógrafo at Vale (Moatize)
April 1, 2016 - January 1, 2022
Como topógrafo na mina de carvão, marquei limites de lavra, realizei marcação de furos para perfuração e desmonte, levantamentos de pilhas de estéril e carvão e cálculo de volumes de minério e estéril. Atualizei mapas da mina, apoiei a equipa de geologia e o planeamento, controlando a marcação e evolução das frentes de lavra e ram­pas de acesso. Implantei marcos geodésicos e pontos de controlo, fiz medições para cálculo de volumes de corte e aterro, processando dados em software Surpac. Elaborei memoriais descritivos e relatórios técnicos, e executei medição de cotas e controlo de taludes e rampas.
Mine Surveyor at Vale
January 1, 2016 - January 1, 2022
Set out mining boundaries and drill holes for drilling and blasting operations. Conducted surveys of coal and waste stockpiles and calculated coal and waste volumes. Updated mine maps and survey information, supported Mine Geology and Mine Planning teams, monitored and marked progress of mining fronts and access ramps, and operated GNSS/GPS equipment (including Topcon, Trimble, and Leica systems). Performed laser scanning surveys using Maptek I-Site technology, established geodetic benchmarks and survey control points, completed cut and fill volume calculations, monitored pit elevations and slope/ramp performance, processed topographic data in Surpac and Maptek I-Site, and prepared technical reports and survey documentation.
Topógrafo (Topografia de Minas) at Vale / Moatize - Engil (Mozambique)
January 1, 2016 - January 1, 2022
I marked mine limits and drill holes for blasting and dismantling, surveyed volumes of ore and waste, updated mine maps, and supported geology and mine planning activities. I tracked the evolution of mining faces and ramps, implemented geodetic control points and survey benchmarks, and carried out measurements for volume calculations (cut/fill and earthworks). I processed survey data using Surpac software, produced descriptive memoranda and technical reports, controlled slopes and ramps, and computed volumes of coal and waste for operational planning and execution.
Auxiliar Topógrafo at Mota-Engil
January 1, 2015 - January 1, 2016
Atuei como auxiliar na mina de carvão, realizando levantamentos topográficos para definição de dimensões, relevo e limites de terrenos. Usei estação total, GPS RTK, níveis e drones para coleta de dados. Efetuei marcação de pontos e eixos para execução de obras, marcação de rampas conforme recomendações da mina, e controle de níveis em praças de carga e descarga. Auxiliei na delimitação e apoio ao levantamento e planejamento das frentes, garantindo organização e rastreabilidade das medições.
Mine Surveyor at Mota Engil / Tete
January 1, 2015 - January 1, 2016
Conducted topographic surveys to determine terrain features, dimensions, elevations, and boundaries. Operated Total Stations, RTK GPS, levels, and other surveying equipment. Set out points and alignments for mining and infrastructure work, set out mine ramps according to operational requirements, and controlled elevations in loading and dumping areas.
Auxiliar Topógrafo (Mining) at Mota-Engil (Moatize)
January 1, 2015 - January 1, 2016
I supported surveying tasks by performing topographic surveys to determine dimensions, relief, and terrain limits. I used Total Station, GPS RTK, levels, and drones to collect data, marked points and axes for execution, and assisted with ramp layout according to mine recommendations. I controlled elevations in loading and unloading areas, ensuring correct set-out and alignment for field measurement workflows.
Técnico de Geologia (Geologia de Minas) at Vulcan (Tete/ Moatize area)
January 1, 2015 - January 1, 2022
I performed geologic mapping and identified lithologies, carried out rock/coal/soil sampling, and documented logging results. I supported mineral exploration and prospecting programs, ensured correct separation of ore and waste to avoid contamination, and marked polygons/areas of interest along with frontiers of development. I also monitored geologic risks (faults, dykes, and slope instability), prepared technical reports and geologic maps, and ensured compliance with health, safety, and environmental procedures during fieldwork. Equipment included GPS/geologic compass and technical software such as Maptek Maptek and other corporate geologic tools.
Auxiliar Topógrafo at Mota-Engil (Moatize)
January 1, 2015 - January 1, 2016
Fiz levantamentos topográficos para determinar dimensões, relevo e limites de terrenos; utilizei estação total, GPS RTK e drones para recolha de dados. Marquei pontos e eixos para execução das obras e realizei marcação de rampas conforme recomendações. Controlei níveis em praças de carga/descarga, assegurando precisão na recolha e organização dos dados para apoiar as atividades de campo.
Auxiliar Topógrafo at Consórcio Soares da Costa / Mota-Engil / Opway
September 1, 2010 - May 1, 2015
Apoiei na montagem e nivelamento de equipamentos topográficos (estação total, nível e GPS). Transportei, organizei e conservei equipamentos e acessórios. Realizei sinalização e apoio na segurança durante medições (mirar, balizas, prismas e instrumentos), e marquei pontos no terreno conforme orientação do topógrafo (casas, piquetes e tinta). Auxiliei na abertura de picadas e limpeza da área para facilitar medições. Registrei anotações de campo e conferi dados coletados. Apoiei a implantação de eixos, limites, estradas, edifícios e obras civis, além de auxiliar em levantamentos planialtimétricos e cadastrais na obra de construção de ponte Kassuende (Tete).
Auxiliar Topógrafo at Consórcio Soares da Costa / Mota-Engil / Opway (ponte Kassa­uende, Tete)
September 1, 2010 - May 1, 2015
Apoiei montagem e nivelamento de equipamentos topográficos (estação total, nível e GPS), bem como transporte, organização e conservação de equipamentos e acessórios. Assegurei posicionamento/marcação de miras, balizas e instrumentos durante medições, e marquei pontos no terreno conforme orientação do topógrafo (com cadernos/cotas conforme necessário). Ajudei na abertura de picadas e limpeza para facilitar medições, registando notas de campo e verificando os dados recolhidos. Apoiei implantação de eixos, limites, estradas, edifícios e obras civis, além de auxiliar levantamentos planialtimétricos e cadastrais.
Assistant Surveyor at Soares da Costa / Mota-Engil / Opway Consorcium
January 1, 2010 - January 1, 2015
Support surveying activities during the construction of the Kassuende Bridge in Tete Province. Assist with setup and leveling of Total Station, levels, and GPS equipment. Help with field measurements and survey data collection; mark points using stakes, pegs, and other field markers under survey supervision. Support set-out of alignments, boundaries, roads, buildings, and civil works. Record field notes and verify collected data; assist with topographic and cadastral surveys. Maintain and organize surveying equipment and accessories.
Assistant Surveyor at Soares da Costa / Mota Engil / Opway Consortium
January 1, 2010 - January 1, 2015
Supported surveying activities during construction of the Kassuende Bridge in Tete Province. Assisted with setup and leveling of Total Stations, levels, and GPS equipment, carried out field measurements and survey data collection, and marked points using stakes, pegs, and other field markers under surveyor supervision. Supported set-out of alignments, boundaries, roads, buildings, and civil works; recorded field notes and checked collected data; assisted with topographic and cadastral surveys; and maintained and organized surveying equipment and accessories.
Auxiliar Topógrafo (Construção civil/infraestrutura) at Consórcio Soares da Costa / Mota-Engil / Opway
January 1, 2010 - May 1, 2015
I assisted with mounting and leveling of topographic equipment (Total Station, levels, and GPS). I handled transport, organization, and proper storage of equipment and accessories, secured instruments during measurements, and marked points on the ground using pegs/pickets and paint according to the topographer’s orientation. I helped prepare and clear areas for measurements, recorded field notes, and supported the set-out of axes, limits, roads, buildings, and civil works. I also supported planimetric surveys and cadastral measurement activities.

Education

at Instituto Politécnico de Tecnologia e Empreendedorismo de Tete
January 1, 2016 - January 1, 2018
Technical degree (Mining Geology/Mining & Geology related) at Instituto Politécnico de Tecnologia e Empreendedorismo de Tete
January 1, 2016 - January 1, 2018
Technical Diploma at Instituto Politécnico de Tecnologia e Empreendedorismo de Tete
January 1, 2016 - January 1, 2018
Geologia e Minas at Instituto Politécnico de Tecnologia e Empreendedorismo de Tete
January 1, 2016 - January 1, 2018
Technical Diploma at Instituto Politécnico de Tecnologia e Empreendimentos de Tete
January 1, 2016 - January 1, 2018

Qualifications

RA C - Noções de Primeiros Socorros (RAC)
January 11, 2030 - October 1, 2026
Segurança de Riscos e Explosivos (RAC)
January 11, 2030 - October 1, 2026
Segurança da Informação – Boas Práticas na Vale
January 11, 2030 - October 1, 2026
Programa Global Anticorrupção – Vale S.A.
January 11, 2030 - October 1, 2026
Código de Ética e Conduta – Vale S.A.
January 11, 2030 - October 1, 2026
Capacitação I-site – Maptek
January 11, 2030 - October 1, 2026
Conceitos de Topografia e Funcionalidades da Maptek
January 11, 2030 - October 1, 2026
Ambiente Corporativo – Vale S.A (Código de Ética e Conduta)
January 1, 2016 - October 1, 2026
Programa Global Anticorrupção – Vale S.A
January 1, 2016 - October 1, 2026
RAC – Noções de Primeiros Socorros
January 1, 2016 - October 1, 2026
RAC – Segurança de Riscos e Explosivos
January 1, 2016 - October 1, 2026
Segurança da Informação – Boas Práticas na Vale
January 1, 2016 - October 1, 2026
Capacitação I-site – Empresa Maptek
January 1, 2016 - October 1, 2026
Conceitos de Topografia e Funcionalidades da Mapttek
January 1, 2016 - October 1, 2026
Maptek I-Site Training
January 11, 2030 - October 1, 2026
Vale Corporate Orientation
January 11, 2030 - October 1, 2026
Vale Code of Ethics and Conduct
January 11, 2030 - October 1, 2026
Global Anti-Corruption Program
January 11, 2030 - October 1, 2026
RAC – Basic First Aid
January 11, 2030 - October 1, 2026
RAC – Explosive Risk Safety
January 11, 2030 - October 1, 2026
Information Security Best Practices
January 11, 2030 - October 1, 2026
Surveying Concepts and Mine Functionality Training
January 11, 2030 - October 1, 2026
Ambiente Corporativa – Vale S.A. (Código de Ética e Conduta; Programa Global Anticorrupção; R.A.C. Noções de Primeiros Socorros)
January 1, 2016 - October 1, 2026
R.A.C. Segurança de Riscos e Explosivos
January 1, 2016 - October 1, 2026
Segurança da Informação – Boas Práticas na Vale
January 1, 2016 - October 1, 2026
Capacitação I-site – Empresa Maptek
January 1, 2016 - October 1, 2026
Conceitos de Topografia e Funcionalidades (Maptek / Surpac)
January 1, 2016 - October 1, 2026
Maptek I-Site Training
January 11, 2030 - October 1, 2026
Vale Corporate Orientation
January 11, 2030 - October 1, 2026
Vale Code of Ethics and Conduct
January 11, 2030 - October 1, 2026
Global Anti-Corruption Program
January 11, 2030 - October 1, 2026
RAC – Basic First Aid
January 11, 2030 - October 1, 2026
RAC – Explosive Risk Safety
January 11, 2030 - October 1, 2026
Information Security Best Practices
January 11, 2030 - October 1, 2026
Surveying Concepts and Mine Functionality Training
January 11, 2030 - October 1, 2026

Industry Experience

Agriculture & Mining, Professional Services, Education, Real Estate & Construction, Other
    Construção da nova ponte Kassuende Tete

    Cálculo de volume na área de aterro